Cabana Canal III Stage was finalized successfully
(December 18, 2007) On December 27, 2006 was signed the contract for the execution of the work Cabana Canal III Stage with INADE and PELT. The works started on January 24, 2007 at Puno, with a term of 135 days.
The work included the construction of the main channel of 4,521 m and 2 lateral ones of 1400 and 1000 m. Both lateral channels were changed by a technified irrigation system. This change will increase the productivity of the agricultural fields of the zone.
The work finished on July 16, 2007 without delays. On September 7, 2007 the work was received and accepted by INADE.
Thanks to our operations team led by our Operation Manager Engineer Guillermo Villanueva and the Resident Engineer Juan Franco Guevara was possible the successful execution of this work.